Project Date: 13th November 9 AM
Location: Eura,Finland
Scope of work:
labelling up of all the existing patch cables in the rack, so that it is easy to re-patch into new rack.
removing all the devices out of the old rack,
remove the old rack from the comms rooms and insert the new one. (New rack should be pre-built and it is not our responsibility to remove the old one from the site).
reinstall the equipment into the new cabinet, along with the new switches.
Perform testing to confirm that re-installation was successful.
Budget: $150
Posted On: November 08, 2018 07:54 UTC
ID: 214661366
Category: IT & Networking > Network & System Administration
Skills: Network Engineering
Country: Philippines
click to apply